Welcome to DU! The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards. Join the community: Create a free account Support DU (and get rid of ads!): Become a Star Member Latest Breaking News Editorials & Other Articles General Discussion The DU Lounge All Forums Issue Forums Culture Forums Alliance Forums Region Forums Support Forums Help & Search

dave99

(586 posts)
6. Idiot says: "We will drain some of the water, either immediately before or after the Fourth of July, to do the permanent
Tue Jun 23, 2026, 07:29 PM
Tuesday

repair," Trump said.

The shitstain DOES NOT KNOW you need to DRY the COMPLETE surface.

Should be exposed to AIR for at least 4 weeks before start of work. Keeping Dried Areas covered in traps to avoid resaturation from rain water.

A REAL repair should take 18 to 24 weeks to allow curing time (drying for the MAGAs) before a drop of FILTERED water is put back into the area.

BUT these contractor will not do so and we'll be back to this point again..